亚洲一区二区三区av免费,国产综合久久精品亚洲,人妻少妇精品视频专区二区三区,日本二区不卡免费视频,色婷婷av狠狠久久久,日韩一区二区三区直播,丝袜美腿亚洲综合伊人,久久综合久久一区二区,日韩成人在线免费视频,久久综合精品一区二区

        <li id="xfipc"><legend id="xfipc"></legend></li>
        <rt id="xfipc"><small id="xfipc"></small></rt>

        <rt id="xfipc"><small id="xfipc"></small></rt>
        <label id="xfipc"></label>
      •   CHINESE | ENGLISHContact usWuan Keli Steel Co., Ltd.
        Current position:Home > News > Flexible cast iron drainage pipe project applicati

        News

        Flexible cast iron drainage pipe project applicati

        Release date:2013-11-29 13:49:25  Source:Wuan Keli Steel Co., Ltd.

        According to the construction experience in the actual installation works , A -and W-shaped pipe with the use of the two is better, both to meet the needs of the construction quality , functionality , but also can save materials and reduce costs. Generally horizontal drainage mains , the first floor of the family should adopt the A -tube pipe , drainage and drainage branch pipe riser should adopt the W -shaped tube . With the use of this advantage is : A -tube due to the better mechanical properties gland flange connection , doing horizontal drainage pipe when dry , can guarantee the life and functionality. Meanwhile , due to its good mechanical strength , especially for high-level cross- tube drainage of households that can withstand the impact of the upper runoff .
        W -tube due to the quick installation, the interface can flex good , to do a drainage riser selection of materials , especially as the installation of drainage construction in the toilet and bath horizontal branch pipe , you can use its interface can be a good and tight flex nature of the slope drains be well controlled . At the same time due to the characteristics of W-type pipe fittings , combined with the status quo now completed renovation of residential projects ( usually toilet and bathroom drain standpipe Ming Lu ) , when conducting covert riser decoration , easy Decoration , you can save space and increase the actual area . In addition, the A -and W-shaped with the use of two pipes , in addition to the above reasons, but also because the remaining A short -tube installation and construction materials generated during the installation can be used as ground horizontal drainage branch pipe , saving material , with good economic benefits. At home and abroad combined use of the two pipes , the author of his own little experience in construction use , focusing on the installation and construction of W -shaped tube , make a brief introduction .
        W -tube connecting pieces made ??of stainless steel clamp connection construction . Stainless steel clamp piece consists of pouches, clamps, perforated roll axis and bolts. Interface uses a rubber sleeve seal , good effect, can withstand vibrations from all directions ( including earthquake ) . Housing is stainless steel clamps, beautiful solid interfaces , corrosion-resistant . When you install an interface to the maximum diameter of the hoop to relax the limit , first set into the stainless steel jacket pipe , then both ends of the interface, respectively, into the rubber kit, stainless steel outer jacket sleeve in the rubber sleeve is screwed firmly to obtain satisfactory results.
        W -tube connection determines its installation and maintenance features , however , the use of bolt connections extruded rubber sealing cap connection with the sealing material itself in addition to the degree of relationship , but depending on the degree of fastening bolts . According to the author's experience in construction , tightening bolts, preferably using special tools provided by the manufacturers supporting the ( currently on the market there ) , so that you can ensure that the tightening effect and can improve work efficiency. In addition, when clogged drains , just to clamp pieces can be removed , simple, which is the traditional advantages of other pipes do not.
        In order to ensure the quality of construction and the use of function to prevent run, run, drip, leak phenomenon, in the actual project , in addition to routine tests pass water through ball , the author also uses a full test and tap water combined with listening to the sound approach. The materials for each full of water entering the test checks all be admitted after passing specific use , tapping materials , such as sound Qingcui , then pass , if there is a buzzing sound , then rupture . Second, in a day after pipeline construction , temporary closure of the nozzle to prevent clogging of the debris falling into the pipes. After the installation is complete between each toilet and bathroom are on the drainage branch pipe full of water tests done , mainly to check for leaks interfaces , there are problems in time. 

        精品制服丝袜一区二区三区| av成人免费在线播放| 六月丁香综合激情在线乱码| 精品国产成人在线免费| 国产一区二区三区欧美在线| 亚洲天堂av免费在线看| 国产成人精品综合在线| 这里只有精品自拍视频| 国产精品内射婷婷一级三| 熟女精品激情免费视频| 中文字幕亚洲好看有码| 懂色av不卡在线中文| 国语av一区二区三区| 国产成人尤物精品一区| 国产第一精品福利在线| 一区二区三区欧美人妻| 成人免费的性色视频网站| 尤物在线观看视频免费| 在线播放中文字幕日本| 国产91成人精品高潮综合久久| 亚洲老头野外激情视频| 亚洲乱色一区二区三区丝袜| 综合色区亚洲熟妇另类| 一个人看的WWW片免费高清视频| 国产精品无码MV在线观看| 国产美女一区二区三区视频| 国产精品内射婷婷一级| 欧美亚洲另类国产精品色| 亚洲日韩欧洲乱码AV夜夜摸| 国产无遮挡猛进猛出的| 人妻的屁股一区二区三区| 黄片一区二区三区丝袜| 亚洲人成国产精品无码果冻| 99国产精品美女久久| 国产女人精品视频网站| 亚洲老女人区一区二视频| 尤物视频在线观看国产| 亚洲国产av一区二区三| 三级黄色片亚洲二区三区四区| 日本一区二区精品专区| 国产日韩精品一区二区三区在线 |